PROJECT COST CONTROL IN THE NIGERIAN CONSTRUCTION INDUSTRY (A CASE STUDY OF EL-ALAN CONSTRUCTION COMPANY (NIGERIA) LIMITED)

Project Information:

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 69 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   5,913 people found this useful

Project Department:

PROJECT MANAGEMENT UNDERGRADUATE PROJECT TOPICS, RESEARCH WORKS AND MATERIALS

Project Body:

CHAPTER ONE

INTRODUCTION

Background of the study

Project cost controls in the Nigerian construction sector have always been under studied. On the course of prosecuting a project, controlling the cost of these projects would help in maintaining such projects from being too capital intensive which may lead to the project being abandoned. For every project to be successfully executed, its cost must have been analyzed and the cost from start to finish noted so as to prevent unnecessary contingency spendings which may hamper the complete execution of the project. Cost control includes monitoring cost, task completion, and time. If total cost of a project at a given time is over the cost baseline, cost control measures may be necessary. Such project management actions may range from ensuring that only tasks within the scope of the work are being performed to alerting stakeholders of potential cost overruns. As a project manager, it is important, professional, and ethical to identify and report on these issues as soon as they are identified.

Organizations whether private or government owned must complete projects on budget to achieve financial objectives and save cost. Project managers applying cost control techniques effectively can ensure that projects stay within projected budgets or are allowed to exceed budgets in a controlled way for specific reasons. When an organization implements appropriate project cost controls, it reduces risk and receives the full benefits anticipated from project completion.

Controlling costs means meeting a budget that is based on cost estimates. The two components of such estimates are the scope of the work and the cost of each completed task. The project plan details the requirements for the project, which you have to translate into activities. A typical activity requires labor, materials and equipment. Once you have defined the project scope in terms of activities and divided the activity into its cost components, you can calculate cost estimates using costs from historical sources, bids, industry norms and other projects as a base.

Statement of the general problem

The increase in the number of abandoned, uncompleted and under completed projects by individuals, companies and even government has been a cause for serious concern. This high rate of abandonment has inflicted our infrastructural development negatively and may have dissuadedprospective investors from investing in our economy.

Aims and objectives of the study

The following will be our aims and objectives for undertaking this study

  • To examine the level of implementation of project cost control in the Nigerian construction industry.
  • To know if adherence to project cost control increases the profitability of Nigerian construction industry.
  • To know if project cost control improves the Nigerian construction industry.
  • To know if project cost control reduces abandonment and under completion of projects.

Significance of the study

This study will be of great importance to project managers, government, researchers and captains of industries seeing that it would unravel the implications and benefits of ensuring project cost control in the Nigerian construction industry and the economy of Nigeria at large.

Scope of the study

This study is restricted to project cost control in the Nigerian construction industry with EL-ALAN Construction Company (Nigeria) Limited as its case study.

Limitation of the study

Financial constraint- Insufficient fund tends to impede the efficiency of the researcher in sourcing for the relevant materials, literature or information and in the process of data collection (internet, questionnaire and interview).

Time constraint- The researcher will simultaneously engage in this study with other academic work. This consequently will cut down on the time devoted for the research work.

Research Questions

  • What is the impact of project cost control on the Nigerian construction industry?
  • Does project cost control enhance the quality of constructions in the Nigerian construction industry?
  • What is the impact of project cost control on the infrastructural development of Nigeria?
  • Is there a relationship between project cost control and economic development in Nigeria?

Research Hypothesis

H0: Effective project cost control does not improve the quality of constructions in the Nigerian construction industry

H1: Effective project cost control does not improve the quality of constructions in the Nigerian construction industry

Definition of terms

  • Project:A planned piece of work that is designed to find information about something, to produce something new, or to improve something.
  • Cost:the amount of money that you need in other to buy, make or do something.
  • Construction:the process or method of building or making something, especially roads, building, bridges etc.

 

REFERENCES

Aibinu, A.A. and Jagboro, G.O. (2002) The Effects of Construction Delays on Projects delivery in the Nigerian Construction Industry. International Journal of Project Management 20, 593 – 599

Asamoah, J. (2002) Satisfying the Energy Hunger in West Africa: A Progress on West Africa Gas Pipeline. African energy, Brooke Patrick Publications, Johannesburg, http//www.africanenergy.co.za

Buhari I.B. (1991) Inflation and the Nigerian economy.The Nigerian Quantity Surveyor.8-9 4.

Get the complete project »


Instant Share On Social Media:


Can't find what you are looking for?
Call (+234) 07030248044.

OTHER SIMILAR PROJECT MANAGEMENT PROJECTS AND MATERIALS

A GEOPHYSICAL INVESTIGATION USING SEISMIC REFRACTION METHOD TO DETERMINE THE CAUSE(S) OF ROAD FAILURE

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 121 ::   Attributes: Abstract  ::   7472 engagements

CHAPTER ONE MEANING AND BASIC APPLICATION OF GEOPHYSICS 1.1 INTRODUCTION It is to be noted that the geophysical method of prospecting and delineation of anomalous zone in the subsurface extend its w...Continue reading »

A STUDY INTO THE EFFECTS OF TIMELY DELIVERY OF CONSTRUCTION PROJECT ON ECONOMIC DEVELOPMENT OF NIGERIA

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 91 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   6876 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND OF THE STUDY Time impacts are inevitable on construction projects, primarily because of the uniqueness of each project and the limited resources of time and ...Continue reading »

ASSESSMENT OF ANALAYSIS AND CONTROL OF OVERHEAD EXPENSES IN MANUFACTURING INDSUTRY IN NIGERIA. (A CASE STUDY OF OLA-OLUWA AINA WIRE INDUSTRY LIMITED, OSOGBO.)

 Format: MS WORD ::   Chapters: 1 - 5  ::   Pages: 35 ::   Attributes: Questionnaire, Data Analysis

CHAPTER ONE Introduction 1.1 Background To The Study Every manufacturing organization in ars costs in the production of goods and rendering of services. Some of such costs cannot be directly traced t...Continue reading »

ASSESSMENT OF CONSTRUCTION MANAGEMENT TECHNIQUES IN NIGERIA CONSTRUCTION INDUSTRY (A CASE STUDY OF IBADAN IN OYO STATE)

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 67 ::   Attributes: Questionnaire, Data Analysis, Abstract  ::   3905 engagements

CHAPTER ONE INTRODUCTION BACKGROUND OF THE STUDY A major concern of stakeholders (clients, consultants, contractors, e.t.c) in Nigerian construction industry is how to improve service delivery. Mit...Continue reading »

CAUSES OF CONSTRUCTION PROJECT FAILURES AND ABANDONEMTS IN NIGERIA

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 65 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   11967 engagements

CHAPTER ONE INTRODUCTION 1.1 BACKGROUND TO THE STUDY Abandoned projects and construction failure including construction projects and other civil engineering infrastructure development project like...Continue reading »

COST CONTROL AND EFFECTIVE PROJECT DELIVERY OF CONSTRUCTION COMPANIES IN RIVERS STATE

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 92 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   4823 engagements

CHAPTER ONE INTRODUCTION 1.1. BACKGROUND OF THE STUDY The core objectives of the construction industry which are to deliver project within a short time, reasonable cost, good quality and safety of ...Continue reading »

What are looking for today?

WHAT OUR CUSTOMERS ARE SAYING:
  • 1. Abubakar Sani from Nigerian Investment Promotion Commission said "I had a wonderful experience using ProjectClue, they delivered not only on time, but the content had good quality. I recommend ProjectClue for any project research work.".
    Rating: Excellent
  • 2. Ogunniran Olawale from Ekiti state university said "Projectclue is really safe and reliable Quick access to project works Nice customer service Fast delivery of request Recommend this toy fellow students ".
    Rating: Excellent
  • 3. Fahat Nasir from isa kaita college of education dutsinma said "Fish farming a solution unemployment ".
    Rating: Very Good
  • 4. Ajimbi Oluwarotimi from Theology school osun said "Good ".
    Rating: Very Good
  • 5. Clement Abdullahi Ogiji from National Open University of Nigeria said "I am a living witness and have recommended project clue to a lot of students, so far none have been disappointed, very reliable and, trustworthy and dependable".
    Rating: Excellent
  • 6. Jhuee from Sultan national high school said "Good quality. I recommend project clue for any project research work.".
    Rating: Excellent