Project Topic:

THE IMPACT OF MATERIAL REQUIREMENT PLANNING IN MANUFACTURING INDUSTRY

Project Information:

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 55 ::   Attributes: Questionnaire, Data Analysis, Abstract  ::   4,472 people found this useful

Project Department:

BUSINESS ADMINISTRATION UNDERGRADUATE PROJECT TOPICS, RESEARCH WORKS AND MATERIALS

Project Body:

CHAPTER ONE

INTRODUCTION

BACKGROUND OF THE STUDY

Production is the transformation of one set of resources into a second set. In order to describe the constraints and opportunities for production, different methods have been developed through the years both in the practical engineering context and from an academic point of view (Grubbström, 1995). For the multi-level, multi-stage production-inventory system, an analysis applying the combined methodology of input-output analysis and the place transform has proven to be useful.

In practice, the managerial information system dealing with multi-level, multi-stage production-inventory systems is referred to as Material Requirements Planning (MRP). Here, product complexity as well as lead times are essential ingredients. In this research we allow these terms to be used in a synonymous way both for the theoretical analysis and as a name for the corresponding practical information system.

In a multi-level manufacturing system finished products, subassemblies, components, raw materials, etc., (items), are distinguished. MRP reduces a master production schedule of finished products into a time-phased suggested schedule of requirements of intermediate items to be manufactured and purchased, based on the estimated external demand for finished products. This “parts explosion” determining requirements from higher levels down to lower levels (upstream to downstream) traces the product structures.

Material Requirements Planning (MRP) is a computer-based inventory management system designed to assist production managers in scheduling and placing orders for dependent demand items. Dependent demand items are components of finished goods—such as raw materials, component parts, and subassemblies—for which the amount of inventory needed depends on the level of production of the final product. For example, in a plant that manufactures bicycles; dependent demand inventory items might include aluminium, tires, seats, and derailleurs.

The first MRP systems of inventory management evolved in the 1940s and 1950s. They used mainframe computers to explode information from a bill of materials for a certain finished product into a production and purchasing plan for components. Before long, MRP was expanded to include information feedback loops so that production personnel could change and update the inputs into the system as needed. The next generation of MRP, known as manufacturing resources planning or MRP II, also incorporated marketing, finance, accounting, engineering, and human resources aspects into the planning process. A related concept that expands on MRP is enterprise resources planning (ERP), which uses computer technology to link the various functional areas across an entire business enterprise.

MRP works backward from a production plan for finished goods to develop requirements for components and raw materials. "MRP begins with a schedule for finished goods that is converted into a schedule of requirements for the subassemblies, component parts, and raw materials needed to produce the finished items in the specified time frame," William J. Stevenson wrote in his book Production/Operations Management. MRP breaks down inventory requirements into planning periods so that production can be completed in a timely manner while inventory levels—and related carrying costs—are kept to a minimum. Theoretically, it is often asserted that, when implemented and used properly, MRP can help production manager’s plan for capacity needs and allocate production time. However, it is also argued that MRP systems can be time consuming and costly to implement, which may put them out of range for some small businesses. In addition, the information that comes out of an MRP system is only as good as the information that goes into it. Thus, for MRP to be successfully implemented and sustained, current accurate bills of materials, part numbers, and inventory records must be maintained. These and similar, issues relating to the concept and practice of MRP is what this research work intends to examine.

STATEMENT OF THE PROBLEMS

As stated earlier, MRP is a planning technique designed to assist production manager in scheduling and placing orders for dependent demand items such as raw materials, component parts and sub-assemblies relative to the desired level of production. However, it has been observed that the technique is not yet very popular among organization. Not only that, it is also argued that the system is so time consuming and costly that not every organization can adopt it.

In this research work, attempts have been made to critically assess the possible contribution of the MRP technique to the efficiency of manufacturing organization with particular focus on production cost.

OBJECTIVES OF THE STUDY

The objective of this study is to examine Material Requirement Planning as it ensures availability of material in an organization. The specific objectives are:

  1. To highlight the usefulness of MRP in PAN.
  2. To identify the various materials related operational problems in PAN that can be handled by the application of the MRP technique.
  3. To provide knowledge for future research work.

STATEMENT OF HYPOTHESIS

The study shall be guided by this hypothesis, thus;

H0:     Material Requirement Planning is not a strategy for cost reduction in manufacturing organization

H1:     Material Requirement Planning is a strategy for cost reduction in manufacturing organization

SIGNIFICANCE OF THE STUDY

The significance of this research work cannot be over emphasized because it is a requisite for the award of higher National Diploma in Production and Operations Management.

The study will help manufacturing organizations to appreciate and understand MRP as it affects productivity and reveal ways in which it could be applied for desired benefits.

Students in business and management studies can also expand their knowledge base from this research work. It can also be used as a reference material and a base for further research.

To the government, the study will introduce an efficient system of production planning to replace the traditional, inefficient practices found in public corporations.

SCOPE OF THE STUDY

This research work covers the Material Requirement Planning (MRP) as a cost reduction strategy in a manufacturing concern. It however, limits it scope to PAN Kaduna.

 LIMITATIONS OF THE STUDY

  1. Finance: with the present doomed financial situation the researcher finds it difficult to purchase necessary materials for the project at reasonable cost and also to carryout other relevant facts find exercise with ease.
  2. Time constraint: It is very important for one to get enough time to accurate and up to date, but the time available for this work is not adequate as a student, the researcher has to face the project, at the same time coupling with the class work, preparation for final examination as well as numerous assignments.
  3. Another problem is the acute shortage of qualified, skilled and experienced personnel to effectively provide the researcher with appropriate data in course carrying out the research.

HISTORICAL BACKGROUND OF PAN

The entry of most popular and favourite vehicle Peugeot brand into Nigeria dates back to 1957 when the first set of 100 units of Peugeot 403 car were imported by individual into the country. Within a period of two years Peugeot 403 became so popular as a result of its dependability, suitability in Nigeria roads that assumed the status of official cars for many top government officials and wealthy business people. This unprecedented achievement led to the appointment of SCOA in 1957 as the sole agent for Peugeot cars in Nigeria and imported the first set of 403 Peugeot cars.

Since independence in 1960, the growth rate of Nigerian economy had taken such a proportion that the number of imported cars could no longer cope with the demand, the military government of Nigerians opened negotiation with automobiles Peugeot of France for the setting up of an assembly plant in the country. That dream became reality when on December 15th 1972 Peugeot Automobiles of Nigeria was incorporated with an authorized share capital of N3, million and paid up capital of N2, million on 14th march, 1975 the assembly plant in Kaduna was commissioned by general Yakubu Gowon, the Head of state. That same year the first set of Nigeria Peugeot cars rolled out of the plant.

However, with time a further rise in demand for production at the plant in the country necessitated the federal government introduction of the structured adjustment programme (SAP). Since its inception, PAN has turned out over N370, 000 cars with total assets amounting to N1, Billion at the end of 1990.

Get the complete project »


Instant Share On Social Media:


Can't find what you are looking for?
Call (+234) 07030248044.

OTHER SIMILAR BUSINESS ADMINISTRATION PROJECTS AND MATERIALS

A COMPARATIVE STUDY OF NEWSPAPER COVERAGE OF RURAL/URBAN PROBLEMS IN IMO STATE A CONTENT ANALYSIS OF DAILY CHAMPION, THE SUN AND VANGUARD NEWSPAPERS

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 60 ::   Attributes: Questionnaire, Data Analysis  ::   2448 engagements

CHAPTER ONE INTRODUCTION BACKGROUND OF THE STUDY From a global perspective, third-word countries which are mostly found in the continent of Africa have been conspicuously backward in terms of devel...Continue reading »

A CORPORATIVE ANALYSIS OF RISK MANAGEMENT AND CREDIT ADMINISTRATION IN BANKS (A CASE STUDY OF GUARANTEE TRUST BANK, ACCESS BANK AND FIRST BANK)

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 90 ::   Attributes: Questionnaire, Data Analysis, Abstract  ::   3047 engagements

ABSTRACT The study was aimed at analysingrisk management and credit administrations in banks, case study of Guarantee Trust Bank, Access Bank and First Bank, Maitama, Abuja. The survey research was u...Continue reading »

A CRITICAL APPRAISAL OF CURRENT ASSETS MANAGEMENT IN PUBLIC LIMITED LIABILITY COMPANIES (A CASE STUDY OF NIGERIAN BREWERIES)

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 70 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   7478 engagements

CHAPTER ONE INTRODUCTION Background of the study The advent of asset management is a prerequisite to organizational profitability and growth. The management of asset in public limited liability comp...Continue reading »

A CRITICAL APPRAISAL OF THE APPLICATION OF INFORMATION TECHNOLOGY IN NIGERIAN INDUSTRIES(A CASE STUDY OF NIGERIAN BREWERIES)

 Format: MS WORD ::   Chapters: 1 - 5 ::   Pages: 80 ::   Attributes: Questionnaire, Data Analysis, Abstract  ::   3417 engagements

CHAPTER ONE INTRODUCTION BACKGROUND OF THE STUDY In today’s world, the use of adoption of information technology (ICT) in Nigerian industries could be helpful in the task of capacity building...Continue reading »

A CRITICAL APPRAISAL OF THE STRATEGIES OF EXPORTATION OF MADE IN NIGERIA GOODS (A CASE STUDY OF NIGERIAN EXPORT PROMOTION COUNCIL)

 Format: MS WORD ::   Chapters: 1 - 5  ::   Pages: 48 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   4514 engagements

ABSTRACT A critical appraisal of the strategies of exportation of made in Nigerian goods is a topic chosen from marketing field. The research was conducted mainly to examine the strategies adopted b...Continue reading »

A CRITICAL STUDY ON THE EFFECTS OF JOB STRESS ON THE PERFORMANCE OF BANKERS IN NIGERIA (A CASE STUDY OF UNION BANK, CALABAR)

 Format: MS WORD ::   Chapters: 1-5 ::   Pages: 80 ::   Attributes: Questionnaire, Data Analysis,Abstract  ::   15872 engagements

ABSTRACT The study investigated and evaluated job stress and its effects on job performance among members of staff at Union Bank. The study sought to find out how work-related stress could affect the...Continue reading »

What are looking for today?

WHAT OUR CUSTOMERS ARE SAYING:
  • 1. Abubakar Sani from Nigerian Investment Promotion Commission said "I had a wonderful experience using ProjectClue, they delivered not only on time, but the content had good quality. I recommend ProjectClue for any project research work.".
    Rating: Excellent
  • 2. Ogunniran Olawale from Ekiti state university said "Projectclue is really safe and reliable Quick access to project works Nice customer service Fast delivery of request Recommend this toy fellow students ".
    Rating: Excellent
  • 3. Fahat Nasir from isa kaita college of education dutsinma said "Fish farming a solution unemployment ".
    Rating: Very Good
  • 4. Ajimbi Oluwarotimi from Theology school osun said "Good ".
    Rating: Very Good
  • 5. Clement Abdullahi Ogiji from National Open University of Nigeria said "I am a living witness and have recommended project clue to a lot of students, so far none have been disappointed, very reliable and, trustworthy and dependable".
    Rating: Excellent
  • 6. Jhuee from Sultan national high school said "Good quality. I recommend project clue for any project research work.".
    Rating: Excellent